Skip to content

improving blocks working together #193

improving blocks working together

improving blocks working together #193

Triggered via push February 18, 2025 04:05
Status Failure
Total duration 17s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (8.3)
Process completed with exit code 124.
build (8.1)
The job was canceled because "_8_3" failed.
build (8.1)
The operation was canceled.
build (8)
The job was canceled because "_8_3" failed.
build (8)
The operation was canceled.
build (8.2)
The job was canceled because "_8_3" failed.
build (8.2)
The operation was canceled.