Skip to content

Fix min amount for collateral return #1363

Fix min amount for collateral return

Fix min amount for collateral return #1363

Triggered via pull request December 7, 2024 21:54
Status Failure
Total duration 5m 34s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

main.yml

on: pull_request
Matrix: build
Matrix: continuous-integration
Fit to window
Zoom out
Zoom in

Annotations

15 errors and 2 warnings
build (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_10" failed.
build (ubuntu-latest, 3.8)
Process completed with exit code 1.
build (ubuntu-latest, 3.10)
Process completed with exit code 1.
build (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
build (ubuntu-latest, 3.11)
The operation was canceled.
build (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_10" failed.
build (macos-latest, 3.10)
The operation was canceled.
build (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_10" failed.
build (macos-latest, 3.8)
The operation was canceled.
build (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_10" failed.
build (macos-latest, 3.9)
The operation was canceled.
build (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_10" failed.
build (ubuntu-latest, 3.9)
The operation was canceled.
build (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
build (macos-latest, 3.11)
The operation was canceled.
build (ubuntu-latest, 3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
continuous-integration (ubuntu-latest, 3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636