Support decoding list/indefinite list from cbor #1373
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
main.yml
on: pull_request
Matrix: build
Matrix: continuous-integration
Annotations
16 errors and 2 warnings
|
continuous-integration (ubuntu-latest, 3.11)
Process completed with exit code 1.
|
|
build (ubuntu-latest, 3.9)
Process completed with exit code 1.
|
|
build (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (ubuntu-latest, 3.11)
Process completed with exit code 1.
|
|
build (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (ubuntu-latest, 3.8)
Process completed with exit code 1.
|
|
build (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (macos-latest, 3.10)
The operation was canceled.
|
|
build (macos-latest, 3.11)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (macos-latest, 3.11)
The operation was canceled.
|
|
build (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (macos-latest, 3.8)
The operation was canceled.
|
|
build (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (ubuntu-latest, 3.10)
The operation was canceled.
|
|
build (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
|
|
build (macos-latest, 3.9)
The operation was canceled.
|
|
continuous-integration (ubuntu-latest, 3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
|
build (ubuntu-latest, 3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
integration-test.log
Expired
|
156 Bytes |
sha256:c3ebbb00caf7aec4c52aeeaeb0462474401a11daf437a99e4998449104d53681
|
|