Skip to content

Update arrow-schema requirement from 55.1.0 to 56.1.0 #19

Update arrow-schema requirement from 55.1.0 to 56.1.0

Update arrow-schema requirement from 55.1.0 to 56.1.0 #19

Triggered via pull request September 11, 2025 08:26
Status Failure
Total duration 2m 8s
Artifacts

ci.yml

on: pull_request
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
build (macos-latest)
Process completed with exit code 101.
build (ubuntu-latest)
The operation was canceled.
build (ubuntu-latest)
The strategy configuration was canceled because "build.macos-latest" failed
test (macos-latest)
Process completed with exit code 101.
test (ubuntu-latest)
The operation was canceled.
test (ubuntu-latest)
The strategy configuration was canceled because "test.macos-latest" failed
check
Process completed with exit code 101.
check
Restore cache failed: Some specified paths were not resolved, unable to cache dependencies.