Skip to content

Fix analysis issues and improve the CI pipeline #200

Fix analysis issues and improve the CI pipeline

Fix analysis issues and improve the CI pipeline #200

Triggered via pull request November 19, 2025 18:03
@terrier989terrier989
synchronize #202
fix/ci
Status Cancelled
Total duration 3m 51s
Artifacts

dart.yml

on: pull_request
Matrix: Analyze
Matrix: Analyze
Matrix: PANA
Matrix: Test
Matrix: PANA
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Analyze (cryptography, beta)
Process completed with exit code 1.
Analyze (cryptography, 3.3.0)
Process completed with exit code 1.
Dart CI
The run was canceled by @terrier989.
Test (cryptography, vm)
The run was canceled by @terrier989.
Test (cryptography, vm)
The operation was canceled.