-
Notifications
You must be signed in to change notification settings - Fork 0
Open
Labels
Description
Describe the bug
As R&D we would like to move a plate created in UAT into Production. The first Biosero run intended to be in production was actually done in UAT by mistake (the configuration change didn't save). The run completed cleanly.
RT Ticket Number
728773
To Reproduce
Steps to reproduce the behaviour:
- GBG exe config on the Biosero PC has 2 sections for UAT and Prod connection details
Expected behaviour
Permissions issue with file had prevented the file saving.
Screenshots
NA
Desktop (please complete the following information):
Biosero Windows PC
Additional context
UAT run 240 for destination plate HT-117470 and source plate cpRNA104065 needs to be transferred into production.
See google doc https://docs.google.com/document/d/1O6lVajlwOlcXacTjMXPpSMW4no62NFhW2PsFp8SBMBM/edit?usp=sharing
Reactions are currently unavailable