I have a 4 server farm. 2 APP (APP1/APP2) and 2 WFE (WFE1/WFE2) SharePoint 2016
the current script stops all the services on all the servers simultaneously before installing the CU. I have an requirement to achieve one or all the below scenarios.
- To Install CU sequentially versus simultaneously.
- To change the order how which server to apply the CU. (APP1 ->WFE1 ->APP2 -. WFE2)
- To select which server to apply the CU. (Have a menu option)
I am referencing SharePoint 2016 zero downtime .
https://technet.microsoft.com/EN-US/library/mt767550(v=office.16).aspx