Skip to content

Real to interval#231

Merged
danielward27 merged 3 commits intomainfrom
real_to_interval
Jan 31, 2026
Merged

Real to interval#231
danielward27 merged 3 commits intomainfrom
real_to_interval

Conversation

@danielward27
Copy link
Owner

Introduces some breaking changes to tidy up RationalQuadraticSpline:

  • Uses RealToIncreasingOnInterval in paramax, which is simpler than the approach previously used.

Key breaking change:

  • When constructing a rational quadratic spline, softmax_adjust: float | int = 1e-2, argument has been removed. Instead, minimum widths of the bins of the spline are controlled by a new min_width argument.
  • As a result of the changed parameterization, results may change somewhat.

Smaller breaking changes:

  • Removed the RationalQuadraticSpline.derivative method and RationalQuadraticSpline.min_deriv attributes.

@danielward27 danielward27 merged commit 5330161 into main Jan 31, 2026
1 check passed
@danielward27 danielward27 deleted the real_to_interval branch January 31, 2026 10:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant