Skip to content

WIP full flow using postmessages#92

Draft
Devlaird wants to merge 2 commits intomainfrom
DASH-4249-3ds-setup
Draft

WIP full flow using postmessages#92
Devlaird wants to merge 2 commits intomainfrom
DASH-4249-3ds-setup

Conversation

@Devlaird
Copy link
Contributor

📝 Description

Jira ticket: <JIRA_Ticket_URL>

Details of change

  • <CHANGE_DETAIL_1>

Change Rollback Plan

  • < Roll Back Step 1>
  • < Roll Back Step 2>

Change Checklist

The following must be reviewed and signed off by the creator of the PR. To sign off review and check each

🔑 Security

  • Security of any environment is not reduced by this change.
  • All existing security controls remain in place or have been replaced with equal or stronger controls.

Testing of Changes

  • Testing results have been verified as complete and covering all aspects of the change.
  • Evidence of testing attached
  • Security scans are passing
  • No package vulnerabilities introduced

🔎 Quality assurance

  • Reviewed this PR myself
  • Automated tests are required and included
  • Security controls have been reviewed
  • Changes are Blue-Green friendly

@snyk-io-au
Copy link

snyk-io-au bot commented Jan 15, 2026

⚠️ Snyk checks are incomplete.

Status Scanner Critical High Medium Low Total (0)
⚠️ Open Source Security 0 0 0 0 See details
⚠️ Licenses 0 0 0 0 See details
Code Security 0 0 0 0 0 issues

💻 Catch issues earlier using the plugins for VS Code, JetBrains IDEs, Visual Studio, and Eclipse.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Development

Successfully merging this pull request may close these issues.

1 participant