Skip to content
This repository was archived by the owner on Jun 15, 2024. It is now read-only.

Configure Renovate#2

Open
ghost wants to merge 1 commit intomasterfrom
renovate/configure
Open

Configure Renovate#2
ghost wants to merge 1 commit intomasterfrom
renovate/configure

Conversation

@ghost
Copy link

@ghost ghost commented Nov 16, 2019

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.


Detected Package Files

  • pom.xml (maven)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this Configure Renovate PR is merged
  • Separate major versions of dependencies into individual branches/PRs
  • Do not separate patch and minor upgrades into separate PRs for the same dependency
  • Upgrade to unstable versions only if the existing version is unstable
  • Raise PRs immediately (after branch is created)
  • If semantic commits detected, use semantic commit type fix for dependencies and chore for all others
  • Keep existing branches updated even when not scheduled
  • Disable automerging feature - wait for humans to merge all PRs
  • Ignore node_modules, bower_components, vendor and various test/tests directories
  • Update existing lock files only when package.json is modified
  • Autodetect whether to pin dependencies or maintain ranges
  • Rate limit PR creation to a maximum of two per hour
  • Limit to maximum 20 open PRs at any time
  • Group known monorepo packages together
  • Use curated list of recommended non-monorepo package groupings

🔡 Would you like to change the way Renovate is upgrading your dependencies? Simply edit the renovate.json in this branch with your custom config and the list of Pull Requests in the "What to Expect" section below will be updated the next time Renovate runs.


You have configured Renovate to use branch master as base branch.

What to Expect

With your current configuration, Renovate will create 5 Pull Requests:

Update dependency commons-validator:commons-validator to v1.6
Update dependency log4j:log4j to v1.2.17
  • Schedule: "at any time"
  • Branch name: renovate/log4j-log4j-1.x
  • Merge into: master
  • Upgrade log4j:log4j to 1.2.17
Update dependency org.apache.maven.plugins:maven-javadoc-plugin to v2.10.4
  • Schedule: "at any time"
  • Branch name: renovate/org.apache.maven.plugins-maven-javadoc-plugin-2.x
  • Merge into: master
  • Upgrade org.apache.maven.plugins:maven-javadoc-plugin to 2.10.4
Update dependency org.mule.tools.devkit:mule-devkit-parent to v3.9.8
  • Schedule: "at any time"
  • Branch name: renovate/org.mule.tools.devkit-mule-devkit-parent-3.x
  • Merge into: master
  • Upgrade org.mule.tools.devkit:mule-devkit-parent to 3.9.8
Update dependency org.apache.maven.plugins:maven-javadoc-plugin to v3
  • Schedule: "at any time"
  • Branch name: renovate/org.apache.maven.plugins-maven-javadoc-plugin-3.x
  • Merge into: master
  • Upgrade org.apache.maven.plugins:maven-javadoc-plugin to 3.1.1

🚸 Branch creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or spam the project. See docs for prhourlylimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant