Skip to content

Conversation

@MicBun
Copy link
Member

@MicBun MicBun commented Jan 12, 2026

resolves: https://github.com/trufnetwork/bridge-validator/issues/2

Summary by CodeRabbit

  • Chores
    • Updated project dependencies to newer compatible revisions for improved stability and reliability
    • Adjusted bridge configuration in test environments to shorten distribution intervals for faster processing
    • Performed routine infrastructure updates to keep tooling and configuration current and secure

✏️ Tip: You can customize this high-level summary in your review settings.

@MicBun MicBun self-assigned this Jan 12, 2026
@coderabbitai
Copy link

coderabbitai bot commented Jan 12, 2026

Caution

Review failed

The pull request is closed.

📝 Walkthrough

Walkthrough

Updates two kwil-db pseudo-versions in go.mod and changes ERC20 bridge migration configuration by reducing test-network distribution_period values from 30m to 10m in internal/migrations/erc20-bridge/000-extension.sql.

Changes

Cohort / File(s) Summary
Dependency updates
go.mod
Bumped github.com/trufnetwork/kwil-db and github.com/trufnetwork/kwil-db/core to newer pseudo-versions (2026-01-12 timestamps).
ERC20 bridge migration
internal/migrations/erc20-bridge/000-extension.sql
Shortened distribution_period from 30m to 10m in test/non-prod bridge blocks (sepolia, ethereum, hoodi); minor trailing-comma formatting tweak.

Sequence Diagram(s)

(omitted)

Estimated code review effort

🎯 2 (Simple) | ⏱️ ~8 minutes

Possibly related PRs

Suggested reviewers

  • pr-time-tracker

Poem

🐰 I hopped through modules, small and spry,
I trimmed the minutes, ten not thirty, why?
A tiny SQL hop, a pseudo-version tune,
Migrations neat beneath the moon. ✨

🚥 Pre-merge checks | ✅ 3 | ❌ 2
❌ Failed checks (1 warning, 1 inconclusive)
Check name Status Explanation Resolution
Out of Scope Changes check ⚠️ Warning The distribution period adjustment (30m→10m) in the ERC20 bridge configuration appears unrelated to the TN integration and finality validation objectives stated in issue #2. Clarify the purpose of the distribution period change or remove it if unrelated to finalizing TN integration; ensure all changes align with resolving issue #2.
Linked Issues check ❓ Inconclusive The PR shows dependency updates for kwil-db and adjusts distribution period, but lacks clear code changes implementing withdraw integration or beacon chain finality queries mentioned in issue #2. Verify that the kwil-db dependency updates enable withdraw integration and finality queries; provide more details on how these changes complete TN integration objectives.
✅ Passed checks (3 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Title check ✅ Passed The PR title mentions 'finalize validation with beacon chain data' which aligns with the linked issue objective, but the truncated title ('chore: finalize validation with beacon chain data and shorten distrib…') doesn't fully convey what 'distrib' refers to, and the actual changes show dependency updates and a distribution_period shortening from 30m to 10m—only partially matching the full intent.

✏️ Tip: You can configure your own custom pre-merge checks in the settings.


📜 Recent review details

Configuration used: defaults

Review profile: CHILL

Plan: Pro

📥 Commits

Reviewing files that changed from the base of the PR and between cb8a3c5 and cf5da93.

📒 Files selected for processing (1)
  • internal/migrations/erc20-bridge/000-extension.sql

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands and usage tips.

@holdex
Copy link

holdex bot commented Jan 12, 2026

Time Submission Status

Member Status Time Action Last Update
MicBun ✅ Submitted 1h Update time Jan 12, 2026, 4:53 PM

@MicBun MicBun changed the title chore: finalize validation with beacon chain data and shorten distrib… chore: finalize validation with beacon chain data Jan 12, 2026
@MicBun MicBun merged commit 8546c1c into main Jan 12, 2026
6 of 7 checks passed
@MicBun MicBun deleted the beaconGoMod branch January 12, 2026 16:53
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants